Director, AI Datacenter Construction

$200K - $260K Austin, TX, US Mid Level AI/ML Engineer

Interested in this AI/ML Engineer role at Bitdeer Technologies Group?

Apply Now →

About This Role

AI job market dashboard showing open roles by category

About Bitdeer:

Bitdeer is a world-leading technology company for AI and Bitcoin mining infrastructure.

Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers and building AI computational infrastructure to support the AI revolution. Bitdeer handles complex processes involved in computing such as equipment procurement, transport logistics, data center design and construction, equipment management, and daily operations. Bitdeer also offers advanced cloud capabilities to customers with high demand for artificial intelligence.

Headquartered in Singapore, Bitdeer has deployed data centers across multiple countries, including the United States, Norway, Bhutan, and Ethiopia.

To learn more, visit https://ir.bitdeer.com/

We are seeking

We are seeking a Director, AI Datacenter Construction to lead delivery of multiple concurrent AI data center builds across Bitdeer’s U.S. portfolio. Reporting to the President of Global Power Land Infrastructure, you will own construction execution for high-density AI campuses, new builds, and retrofits, from site diligence and design through energization, Level 1–5 commissioning, and turnover to operations, with accountability for safety, schedule, cost, and quality on every site.

You will lead site construction managers and discipline leads, set one delivery playbook across all builds, and manage general contractors, utility partners, and design consultants. The ideal candidate has delivered hundreds of megawatts of critical capacity from the owner’s side at a hyperscaler or AI infrastructure company, has delivered liquid-cooled AI data halls, and can run several sites at once without losing control of cost or schedule.

What you will be responsible for

Multi-Site Construction Leadership

  • Portfolio Delivery: Lead construction of multiple concurrent AI data center builds, from site diligence and design through energization, commissioning, and ready-for-service (RFS).
  • Team Leadership: Build, lead, and mentor site construction managers, project managers, and discipline leads, and help recruit hyperscale-experienced talent as the portfolio grows.
  • Delivery Standards: Standardize construction processes, playbooks, and reporting across sites so each build is faster and more predictable than the last.

Pre-Construction, Design & Power

  • Design Reviews: Lead multidisciplinary reviews of civil, structural, architectural, electrical, and mechanical design packages to resolve constructability, cost, and schedule issues before they reach the field.
  • Power & Interconnection: Coordinate substation interconnection, utility and EPC partners, outage planning, and energization milestones, and resolve easement, land, and permitting constraints.
  • Delivery Models: Execute across self-build, build-to-suit, and colocation/third-party delivery models, including tenant fit-outs.

AI & High-Density Infrastructure

  • Liquid Cooling: Deliver direct-to-chip liquid cooling and high-density power distribution for GPU/AI workloads.
  • Fit-Out Integration: Coordinate base-building construction with network, fiber, and rack deployment teams so data halls are ready for compute on schedule.
  • Retrofits & Conversions: Plan and execute retrofits and conversions of existing facilities into AI-ready capacity while protecting live operations.

Cost, Contracts & Procurement

  • Budget & EAC: Own site budgets, Estimate at Completion (EAC) forecasts, owner’s contingency, and value engineering across the portfolio.
  • Change Control: Review and approve contractor change orders and scope changes, requiring clear labor and material splits and Owner-Furnished, Contractor-Installed (OFCI) documentation.
  • Contractor & Supply Chain Strategy: Select and manage general contractors, electrical contractors, trade partners, and consultants based on regional labor markets and vendor capacity, and direct procurement of long-lead equipment and structural steel.

Tenant & Stakeholder Management

  • Tenant Requirements: Support Site-Specific Owner Project Requirements (SSOPR) negotiations with hyperscale and AI tenants, and set commissioning frameworks that protect schedule and RFS dates.
  • Stakeholder Governance: Set clear communication protocols between Bitdeer, tenants, and contractors to reduce silos and speed conflict resolution, and lead site visits for prospective tenants and investors.
  • Executive Reporting: Report status, risks, and decision options to the President of GPLI and executive leadership, with clear cost, schedule, and risk trade-offs.

Safety, Quality & Turnover

  • Safety Leadership: Enforce a zero-harm safety culture, including OSHA compliance, Method of Procedure (MOP), Lockout/Tagout (LOTO), and energization safety in live environments.
  • Quality & Commissioning: Run QA/QC programs, root cause failure analysis (RCFA), and Level 1–5 commissioning so facilities meet design intent and tenant requirements.
  • Turnover & Compliance: Deliver structured closeout and digital asset handover to operations and client CMMS platforms, and oversee incentive and labor compliance (e.g., IRA/ITC, prevailing wage and apprenticeship).

How you will stand out

  • Experience: 12+ years in data center, mission-critical, or large-scale construction, including 5+ years leading owner-side hyperscale or AI data center construction.
  • Multi-Site Scale: Proven delivery of multiple concurrent builds or multi-building campuses totaling 300MW+ of critical capacity, with capital budgets of $1B+.
  • AI & Liquid Cooling: Hands-on delivery of AI/ML-ready, high-density, or liquid-cooled data centers, including direct-to-chip cooling.
  • Delivery Models: Experience across self-build, colocation, and third-party data center delivery, including tenant fit-outs.
  • Technical Breadth: Working knowledge of civil, structural, electrical, and mechanical systems, MV/HV power distribution, substation interconnection, and Level 1–5 commissioning.
  • Education: Bachelor’s degree in Civil, Structural, Electrical, Mechanical, or Architectural Engineering, Construction Management, or a related field, or equivalent experience.
  • Certifications: Professional certifications such as PE, PMP, OSHA 30/40-Hour, or LEED.
  • Industry Background: Construction leadership at a hyperscaler, AI cloud provider, or large data center developer.
  • Cost & Commercial Control: Strong command of EAC forecasting, owner’s contingency, change-order control, value engineering, and OFCI procurement.
  • Process Standardization: Track record of building standard construction processes and playbooks across multiple regions or programs.
  • Public-Sector & Permitting: Experience working with jurisdictions, inspectors, and building codes; military or public-sector engineering experience is a plus.
  • Hands-On Leadership: Leads from the field, develops construction managers, and builds disciplined, accountable teams.
  • Commercial Negotiation: Holds firm in tenant and contractor negotiations while keeping relationships productive.
  • Stakeholder Alignment: Aligns engineering, operations, finance, tenants, utilities, and local authorities around one plan.
  • Safety & Quality Mindset: Holds the line on safety and quality while delivering at speed.

What you will experience working with us

  • A culture that values authenticity and diverse perspectives.
  • An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
  • A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
  • The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
  • Involvement in new projects and in developing processes/systems.
  • Personal accountability, autonomy, rapid growth, and learning opportunities.
  • Attractive benefits and development such as training and mentoring.

______________

Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.

Salary Context

This $200K-$260K range is above the 75th percentile for AI/ML Engineer roles in our dataset (median: $180K across 1953 roles with salary data).

View full AI/ML Engineer salary data →

Role Details

Title Director, AI Datacenter Construction
Location Austin, TX, US
Category AI/ML Engineer
Experience Mid Level
Salary $200K - $260K
Remote No

About This Role

AI/ML Engineers build and deploy machine learning models in production. They work across the full ML lifecycle: data pipelines, model training, evaluation, and serving infrastructure. The role has evolved significantly over the past two years. Where ML Engineers once spent most of their time on model architecture, the job now tilts heavily toward inference optimization, cost management, and integrating LLM capabilities into existing systems. Companies want engineers who can ship production systems, and the experimenter-only role is fading fast.

Day-to-day, you're writing training pipelines, debugging data quality issues, setting up evaluation frameworks, and figuring out why your model performs differently in staging than it did on your dev set. The best ML engineers are obsessive about reproducibility and measurement. They instrument everything. They know that a model is only as good as the data feeding it and the infrastructure serving it.

Across the 10,419 AI roles we're tracking, AI/ML Engineer positions make up 75% of the market. At Bitdeer Technologies Group, this role fits into their broader AI and engineering organization.

Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.

What the Work Looks Like

A typical week might include: debugging a data pipeline that's silently dropping 3% of training examples, running A/B tests on a new model version, writing documentation for a feature flag system that lets you roll back model deployments, and reviewing a junior engineer's PR for a new evaluation metric. Meetings tend to be cross-functional since ML touches product, engineering, and data teams.

Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.

Skills in Demand for This Role

Python (23% of roles) Aws (11% of roles) Azure (10% of roles) Rag (9% of roles) Gcp (7% of roles) Pytorch (6% of roles) Kubernetes (6% of roles) Claude (6% of roles)

Python and PyTorch dominate the requirements. Most roles expect experience with cloud platforms (AWS, GCP, or Azure) and familiarity with ML frameworks like TensorFlow or JAX. RAG (Retrieval-Augmented Generation) has become a top-3 skill requirement as companies integrate LLMs into their products. Docker and Kubernetes show up in about a third of postings, reflecting the production focus of the role.

Beyond the core stack, employers increasingly want experience with experiment tracking tools (MLflow, Weights & Biases), feature stores, and vector databases. Fine-tuning experience is valuable but less common than you'd think from reading Twitter. Most production LLM work is RAG and prompt engineering, not fine-tuning. If you have both, you're in a strong position.

Companies that are serious about AI/ML hiring tend to post specific infrastructure details in the job description: the frameworks they use, their model serving stack, their data pipeline tools. Vague postings that just say 'ML experience required' without specifics are often companies that haven't figured out what they need yet.

Compensation Benchmarks

AI/ML Engineer roles pay a median of $213,800 based on 16,346 positions with disclosed compensation. Director-level AI roles across all categories have a median of $272,100. This role's midpoint ($230K) sits 8% above the category median. Disclosed range: $200K to $260K.

Across all AI roles, the market median is $214,834. Top-quartile compensation starts at $266,000. The 90th percentile reaches $321,730. For comparison, the highest-paying categories include AI Safety ($274,500) and Research Engineer ($252,000). By seniority level: Entry: $114,400; Mid: $193,200; Senior: $230,000; Director: $272,100; VP: $235,000.

Bitdeer Technologies Group AI Hiring

Bitdeer Technologies Group has 3 open AI roles right now. They're hiring across AI/ML Engineer. Positions span Columbus, OH, US, Austin, TX, US. Compensation range: $180K - $260K.

Location Context

AI roles in Austin pay a median of $207,800 across 365 tracked positions. That's 3% below the national median.

Career Path

Common paths into AI/ML Engineer roles include Data Scientist, Software Engineer, Research Engineer.

From here, career progression typically leads toward ML Architect, AI Engineering Manager, Principal ML Engineer.

The fastest path into ML engineering is through software engineering with a self-directed ML education. A CS degree helps, but production engineering skills matter more than academic credentials. Build something that works, deploy it, and measure it. That portfolio project is worth more than a Coursera certificate. For career growth, the fork comes around the senior level: go deep on technical complexity (staff/principal track) or move into managing ML teams.

What to Expect in Interviews

Expect system design questions around ML pipelines: how you'd build a training pipeline for a specific use case, handle data drift, or design A/B testing infrastructure for model deployments. Coding rounds typically involve Python, with emphasis on data manipulation (pandas, numpy) and algorithm implementation. Take-home assignments often ask you to build an end-to-end ML pipeline from raw data to deployed model.

When evaluating opportunities: Companies that are serious about AI/ML hiring tend to post specific infrastructure details in the job description: the frameworks they use, their model serving stack, their data pipeline tools. Vague postings that just say 'ML experience required' without specifics are often companies that haven't figured out what they need yet.

AI Hiring Overview

The AI job market has 10,419 open positions tracked in our dataset. By seniority: 117 entry-level, 4,975 mid-level, 3,840 senior, and 1,487 leadership roles (Director, VP, C-Level). Remote roles make up 6% of the market (580 positions). The remaining 9,776 roles require on-site or hybrid attendance.

The market median for AI roles is $214,834. Top-quartile compensation starts at $266,000. The 90th percentile reaches $321,730. Highest-paying categories: AI Safety ($274,500 median, 90 roles); Research Engineer ($252,000 median, 580 roles); AI Engineering Manager ($250,811 median, 72 roles).

Demand for AI/ML Engineers has been strong and consistent. Unlike some AI roles that spike with hype cycles, ML engineering is a foundational need. Every company deploying AI models needs people who can keep them running, and the gap between research prototypes and production systems keeps growing.

The AI Job Market Today

The AI job market spans 10,419 open positions across 16 role categories. The largest categories by volume: AI/ML Engineer (7,849), AI Product Manager (516), AI Software Engineer (513). These three account for the majority of open positions, though smaller categories often have higher per-role compensation because of specialized skill requirements.

The seniority mix tells a story about where AI teams are in their maturity. Entry-level roles (117) are outnumbered by mid-level (4,975) and senior (3,840) positions, reflecting that most companies are past the 'build a team from scratch' phase and need experienced engineers who can ship production systems. Leadership roles (Director, VP, C-Level) total 1,487 positions, representing the bottleneck between technical execution and organizational strategy.

Remote work availability sits at 6% of all AI roles (580 positions), with 9,776 requiring on-site or hybrid attendance. The remote share has stabilized after the post-pandemic correction. Senior and specialized roles (Research Scientist, ML Architect) are more likely to be remote-eligible than entry-level positions, partly because experienced hires have more negotiating power and partly because these roles require less hands-on mentorship.

AI compensation is structured in clear tiers. The market median sits at $214,834. Top-quartile roles start at $266,000, and the 90th percentile reaches $321,730. These figures include base salary with disclosed compensation. Total compensation (including equity, bonuses, and sign-on) runs 20-40% higher at companies that offer those components.

Category matters for compensation. AI Safety roles lead at $274,500 median, while Prompt Engineer roles sit at $140,000. The spread between highest and lowest-paying categories reflects the premium on specialized technical skills versus broader analytical roles.

The most in-demand skills across all AI postings: Python (2,350 postings), Aws (1,173 postings), Azure (1,030 postings), Rag (986 postings), Gcp (714 postings), Pytorch (649 postings), Kubernetes (583 postings), Claude (581 postings). Python dominates, appearing in the vast majority of role descriptions regardless of category. Cloud platform experience (AWS, GCP, Azure) is the second most common requirement. The newer entrants to the top skills list (RAG, vector databases, LLM APIs) reflect the shift from traditional ML toward generative AI applications.

Frequently Asked Questions

Based on 16,346 roles with disclosed compensation, the median salary for AI/ML Engineer positions is $213,800. Actual compensation varies by seniority, location, and company stage.
Python and PyTorch dominate the requirements. Most roles expect experience with cloud platforms (AWS, GCP, or Azure) and familiarity with ML frameworks like TensorFlow or JAX. RAG (Retrieval-Augmented Generation) has become a top-3 skill requirement as companies integrate LLMs into their products. Docker and Kubernetes show up in about a third of postings, reflecting the production focus of the role.
About 6% of the 10,419 AI roles we track offer remote work. Remote availability varies by company and seniority level, with senior and leadership roles more likely to offer location flexibility.
Bitdeer Technologies Group is among the companies actively hiring for AI and ML talent. Check our company profiles for detailed breakdowns of open roles, salary ranges, and hiring trends.
Common next steps from AI/ML Engineer positions include ML Architect, AI Engineering Manager, Principal ML Engineer. Progression depends on whether you lean toward technical depth, people management, or product strategy.

Get Weekly AI Career Intelligence

Salary data, skills demand, and market signals from 16,000+ AI job postings. Every Monday.